Phase 4 Distribution System Improvements:

Status

Bidding Closed

Bid Date 1/31/22 5:00pm

Company & Contacts

St. Louis MBDA Business Center
Caldwell Tanls, LLC, Petra England, pengland@caldwelltanks.com  

This project consists of constructing a new 75,000 gallon elevated tank[Contract 1], the installation of approximately 16,950 lineal feet of new 4” waterline, approximately 3,300 lineal feet of 6” waterline, and related items in two locations [Contract #2], the rehabilitation of an existing booster pump station including the replacement of piping, pumps, and appurtenances and the replacement of an existing booster pump station including new building, piping, pumps, and appurtenances [Contract #3], and the installation of seven (7) standby generators with LP tanks and automatic transfer switches at various key infrastructure locations throughout the district [Contract #4).